2ND Floor Bathroom Renovation South Pasadena, CA
This bathroom renovation was the 2nd project in the same house that we did complete remodeling. we designed a bigger space of shower with a bench. upgraded the plumbing and electrical. frameless shower door and new vanity and toilet.
Look inside
All
Before
After
During
Project Details
Start date:
June 13, 2017